Project Description

Client:   Cascade Park Plaza
Location:   Romania / Bucharest
Surface Area: 18000 m2
Year Completed:   –
Main Contractor: Method Electric International

Located at the intersection Str . Barbu Vacarescu with Bvd . Tei, Euro Tower is one of the first green office buildings in Bucharest, developed in accordance with international systems of certification of “green” buildings.

Work performed

Electrical low voltage and low currents associated building services: power supply, mounting lighting and ultraterminal equipment, circuits normal lighting and safety, paintings general distribution, fire detection system, air conditioning system inside building.

ew1
Euro Tower 3